Erosion Control (Rule 5)
Are you planning a construction project in the Town of Speedway (Town)? Will you disturb one (1) acre or more of land? If so, then your project is subject to 327 IAC 15-5 (Rule 5) and the Town's local storm water ordinances.
The Town is the plan review and control authority for all construction projects within its corporate boundaries. The following information will explain the steps necessary to comply with Rule 5 and the Town's storm water quality requirements.
-
Develop a Construction Plan, which must include a Storm Water Pollution Prevention Plan (SWPPP). Refer to the document "Guidance on Plan Development". This document includes the required elements along with a brief description.
-
Submit the plans along with a Site Development Permit Application to the attention of the MS4 Operator, Speedway Town Hall, 1450 N. Lynhurst Dr., Speedway, IN 46224. Include with the submittal a $100.00 application fee. An inspection fee of $450.00 for each approved permanent Post Construction BMP is also required. This covers inspection fees for the first three years.
-
Once the construction plan is approved a Notice of Intent (NOI) form must be submitted to IDEM. A copy of the NOI must be sent to the Town.
-
Construction can begin 48 hours after submitting the NOI to IDEM.
-
When all land disturbing activities have been completed, and all temporary erosion and sediment control measures have been removed, a Notice of Termination (NOT) form must be submitted to the Town. After verification by the Town, the NOT will be returned to the project site owner for submittal to IDEM.
All of the forms and ordinances referenced above can be found in the
Related Pages section below. If you have any questions concerning this program please call the MS4 Operator, Norman Berry, at 317-248-1446 or email